WorldWide Drilling Resource

13 APRIL 2023 WorldWide Drilling Resource® WHO’S IN THE NEWS Additional announcements from TGWA, Volvo Construction Equipment, and environmental engineering and construction company Brown and Caldwell can be found by clicking this box in our online issue at: worldwidedrillingresource.com Komatsu Brings Production of Trucks Back to Tennessee To support growing demand, Komatsu has decided to bring production of its HM400-5 articulated haul trucks back to its Chattanooga, Tennessee, factory. Although the trucks were produced in the Chattanooga plant in the mid-2000s, production shifted to the company’s plant in Japan in 2009, where it remained until now. The 473-horsepower HM400-5 trucks are used primarily in the construction, mining, and quarry industries to move material across challenging terrain. In addition to the HM400-5 trucks, the plant produces midsize hydraulic excavators and intelligent excavators. Approximately 525 people are employed at the Chattanooga campus. Send your announcements to bonnie@worldwidedrillingresource.com Honorary Life Membership and Achievement Award The family of Mark Collins, CEO and president of Gulf Coast Pump & Supply for more than 44 years, was on hand to accept the Texas Ground Water Association (TGWA) Honorary Life Membership andAchievement Award on his behalf. The company was also presented with the Wesley Young Award. Work Opportunity Ur-Energy is seeking experienced drill contractors to complete development drilling and install uranium production wells (PVC water wells) at our Lost Creek and Shirley Basin uranium ISR mines in Wyoming. We offer competitive contracts for qualified contractors. Ur-Energy supports its contractors by supplying bits, mud, cement, casing, as well as backhoe services and cementing units. Program Specifics: • Mud-rotary drilling, water well license not required • Average well depth of 450 feet • Rigs need to be 1400 class or larger with an onboard air compressor • Contractor to provide water truck, pipe truck or trailer, and helpers • Mobilization of equipment covered For more information, contact: Mike Mellin, Mine Geologist: mike.mellin@ur-energy.com 307-265-2373 x429 or Randy Harvey, Drilling Supervisor: randy.harvey@ur-energy.com 307-324-4100 x437 www.ur-energy.com Project start date is May 15, 2023 and we are offering multiyear contracts.

RkJQdWJsaXNoZXIy NDk4Mzk=