14 DECEMBER 2026 WorldWide Drilling Resource® In Memoriam Billy Dwayne Basham (1946~2026) Billy Dwayne Basham, 80, of Lester, West Virginia, passed from this life on October 21, 2026. He proudly worked as a core drilling contractor for 56 years before retiring. His life was a testament to hard work, love, and the importance of family. Billy leaves behind a lifetime of memories that will be treasured by those who knew him. His presence will be deeply missed, but the love he shared, the memories he created, and the impact he made on the lives of others will never be forgotten. Though saying goodbye is never easy, his family can find comfort in knowing a part of him will live on through each of them for generations to come. Billy is survived by his loving wife of 44 years, Rita; his children Billie (Ernie), Virginia (David), George, Martha (Blue), and Sara (Jesse); brothers Denny and Jimmy; 14 grandchildren; 24 great-grandchildren; and many nieces and nephews whom he dearly loved. The management and staff of WWDR send their sympathies to Billy’s family and friends. Lest we forget . . . An Engineering Marvel Adapted from Information by the National Archives The Hoover Dam is still considered an engineering marvel, 85 years after it was completed. It is named in honor of President Herbert Hoover, who played a significant role in its creation. For many years, residents of the American southwest sought to tame the unpredictable Colorado River. Devastating floods in the early 1900s prompted residents to seek aid from the federal government, and experiments with irrigation on a limited scale showed this arid region could be transformed into fertile cropland, if only the river could be controlled. The greatest obstacle to the construction was the allocation of water rights among seven states comprising the Colorado River drainage basin. Meetings were held in 1918, 1919, and 1920, but the states could not reach an agreement. Herbert Hoover had visited the Lower Colorado region in the years before World War I and was familiar with its problems and the potential for development. After becoming Secretary of Commerce in 1921, Hoover proposed the construction of a dam on the Colorado River. The project aimed not only to control floods and enhance irrigation but also to deliver a reliable water supply to Los Angeles and Southern California. It would be self-supporting, recovering its cost through the sale of hydroelectric power generated by the dam. In 1921, the legislatures of the states within the Colorado River basin empowered commissioners to negotiate an agreement among themselves. Congress authorized President Harding to appoint a representative for the federal government to serve as Chair of the Colorado River Commission and on December 17, 1921, Harding appointed Hoover to the role. When the commission assembled in Santa Fe, New Mexico, in 1922, the seven states still disagreed over the fair distribution of water. The upstream states feared the downstream states, with their rapidly developing agricultural and power demands, would quickly claim rights to the water by the “first in time, first in right” doctrine. Hoover suggested a compromise where the water would be divided between the upper and lower basins without individual state quotas. The resulting Colorado River Compact was signed on November 24, 1922. It split the river basin into upper and lower halves with the states within each region deciding amongst themselves how the water would be allocated. Between 1922 and 1928, a series of bills advocating for federal funding to construct the dam were introduced by Congressman Phil D. Swing and Senator Hiram W. Johnson, all of which were rejected. The last Swing-Johnson bill, titled the Boulder Canyon Project Act, was largely written by Hoover and Secretary of the Interior Hubert Work. Congress finally agreed, and the bill was signed into law on December 21, 1928, by President Coolidge. On June 25, 1929, less than four months after his inauguration, President Herbert Hoover signed a proclamation declaring the Colorado River Compact effective at last. Appropriations were approved and construction began in 1930. The dam was dedicated in 1935 and the hydroelectric generators went online in 1937. In 1947, Congress officially "restored" Hoover's name to the dam. Hoover Dam was built for $49 million (approximately $1 billion today adjusted for inflation). The power plant and generators cost an additional $71 million. The sale of electrical power generated by the dam paid back its construction cost, with interest, by 1987. The Hoover Dam in 1941. The Colorado River Commission when they signed the Colorado River Compact.
RkJQdWJsaXNoZXIy NDk4Mzk=