WorldWide Drilling Resource®

26 DECEMBER 2026 WorldWide Drilling Resource® Making a Tunnel Under a Railway Adapted from Information by EllisDon Most pedestrian tunnel project are installed by shutting down tracks for a weekend, excavating, and lowering precast sections into place. However, a challenge presented itself at Long Branch GO Station in Toronto, Canada, where innovation was key. With an active rail line, limited access to the rail corridor, and shale bedrock directly beneath the tracks, the project demanded a completely different approach. EllisDon used an innovative Petrucoo Verona temporary bridge system and a cast-and-push tunnel installation technique. The team successfully installed a permanent, watertight tunnel while maintaining continuous train services. To safely excavate beneath active tracks, crews installed modular Petrucoo steel bridges during two tightly orchestrated track closures. Supported by 36 micropiles, these temporary bridges carried full rail loads, enabling excavation to occur directly below. The company excavated 17,716 cubic feet of material, half of which was shale/rock repurposed for beneficial reuse. While working near residential areas, the team set up rigorous environmental safeguards. These measures featured noise, vibration, and air quality monitoring, dust control, and the use of quieter machinery, all to minimize the disruption of the local community. The team constructed the concreate tunnel next to its final position, allowing them to keep a tight schedule while being able to safely deliver a high-quality structure. Complete with waterproofing, reinforcement, and a launching system, the structure was engineered for a precise lateral move beneath the tracks. After the casting of the tunnel, five 244-ton hydraulic jacks pushed the roughly 534-ton, 78-foot concrete tunnel beneath active rail lines, advancing in controlled increments of about 20 inches. Guide curbs ensured perfect alignment throughout the move. Despite the complexity of the operation, train service on the Lakeshore West line continued without interruption. This installation showcased the company’s ability to adapt global engineering techniques to local conditions while prioritizing safety and efficiency. Ricardo Pina, Construction Manager at EllisDon said, “Constructing this tunnel beneath active rail using an innovative methodology is a true reflection of our team’s forward-thinking approach, dedication, collaboration. This milestone highlights our ability to tackle complex challenges with creative, engineering‑driven solutions on this uniquely demanding site. Saying I’m proud of what we’ve achieved together would be an understatement.” www.starironworks.com 257 Caroline Street Punxsutawney, PA 15767 800-927-0560 • 814-427-2555 Fax: 814-427-5164 Serving the Construction Industry See us at GROUNDWATER WEEK Booth 714

RkJQdWJsaXNoZXIy NDk4Mzk=